Year / 2002 |
Location / Sabancı OSB, Adana / Türkiye |
Installed Power / 2x2.000kVA |
Closed Area / 12.000 m2 |
İşveren Firma / Siemens Inc. Co. |
Explanation / Insulation materials production factory: 2x2000 kVA, 12.000m² Designing electrical systems, making engineering calculations, preparing designs of electrical heavy current and low transmission systems, getting their approvals from public offices. |