GAP TURK Inc. Co.

 

Year / 1996
Location / Ashgabat / Turkmenistan
Installed Power / 1.600 kVA
Closed Area / 25.000 m2
Employer / Eta Elektrik Company
Explanation / Ready made clothes factory and auxillary building: Designing electrical heavy current and low current systems, making engineering calculations, preparing system design details and material list.

Referanslarımız