Year / 2006 |
Location / Maslak, İstanbul / Türkiye |
Intalled Power / 8000kVA |
Closed Area / 150.000 m2 |
Employer / Bordo Engineering |
Explanation / Super computer building and other buildings electircal works: 8.000 kVA, 10.000m². Designing UPS electrical systems, making engineering calculations, preparing designs of electrical heavy current and low current systems, preparing tender files. |